Blogs, Case Studies | August 1, 2025
Cost Analysis of Replacing Power Plant Cooling Water Volute Casing Pumps with Mixed Flow and Variable Pitch Propeller Pumps
Overview: Replacements are being considered for a cooling water system that currently consists of four volute casing pumps. A cost analysis is done comparing the baseline versus variable pitch propeller pumps and mixed flow pumps with variable inlet guide vanes. Mixed flow pumps have the fastest payback in this application with a payback time of 0.4 years.